Transport Strategy

Penwallis Bus Priority

Pembrokeshire County Councils Transport Strategy Team invite you to take part in this on-line survey which aims to gather feedback from members of the public and commuters on the following:

  • Open up the current dead-ends on Heol Caradog to Dan y Bryn and Heol Glyndwr.
  • Re-route Bus No. 410 to follow Heol Preseli, Penwallis, Heol Caradog, Dan y Bryn to serve bus stop on Heol Glyndwr.

Why are we proposing these changes? 

The existing bus route around Penwallis is inefficient. The road layout consists of two dead-ends, which requires Bus 410 to then reverse and change direction in the middle of its route, near Heol Glyndwr, leaving insufficient time to serve Penwallis.

The proposals include opening up the current dead-ends on Heol Caradog to Dan y Bryn and Heol Glyndwr.  This would improve service for Bus 410. The proposed route would follow Heol Preseli, a right turn onto Penwallis, left turn into Heol Caradog and then into Dan y Bryn to serve the bus stop on Heol Glyndwr.

The aim of the proposal is to:

  • Improve bus connectivity within the estate
  • Increase accessibility and facilities for people with limited mobility and with few or no facilities for public transport passengers
  • Improve bus journey times
  • Offer a valuable alternative to walking and/or for those who would typically use a vehicle or private hire
  • Improve road safety
  • Improve the overall air quality and reducing the carbon footprint, contributing to a healthier Wales by encouraging people to leave their vehicles at home

The proposed plans are available to view, hard copies are at available County Hall.

Option 1 - Bryn Llewllyn - one way system - bus priority Penwallis

Option 2 - Bryn Llewllyn one way system with access control - bus priority Penwallis

Option 1 - Heol Caradog one way system - bus priority Penwallis

Option 2 - Heol Caradog bus gate - bus priority Penwallis

Penwallis bus routing scheme reverse route

Penwallis bus current route improvements

Penwallis bus routing scheme - Plans

Penwallis bus stop - bus priority

 

An online public survey will be made available and can be accessed, via: Have your say and will remain available for 4 weeks, concluding on 29th November 2024.  

Whilst the County Council encourages consultation responses to be made via our on-line consultation system, paper hardcopies of the designs and survey, along with a comments box, will be located in County Hall. The printed version and paper surveys will remain in place until 29th November 2024, where they will be collected. Posted copies are available upon request by contacting the team on the below email address or contact number.

Please contact the team at majorschemes@pembrokeshire.gov.uk or telephone 01437 76455 if you have any questions.

This on-line survey will close on 29th November 2024 at midnight. Thank you for your time in completing this survey.

ID: 12128, revised 18/10/2024
Print